A condensate-rich, natural gas play primed for large-scale development. Attachie is the leading development opportunity within our portfolio.
Facility Capacity
| 40,000 boe/day 60% crude oil and liquids 40% natural gas | ||||||||
2024 Objectives | Complete construction and commission Attachie Phase I in Q4 2024.
| ||||||||
PDP Reserves1 | 90 MMboe 116 undeveloped locations booked representing 7% of internal inventory estimate |
(1) Reserves as of December 31, 2023.
In Q1 2023, ARC sanctioned the first phase of development of this high-quality asset.
Phase 1 includes:
40,000
boe/day
facility capacity
90
MMcf/day
natural gas processing capacity
25,000
bbl/day
liquids-handling capacity
planned electrification
to support low-emissions profile
water recycling
infrastructure to reduce fresh water use
The project is progressing on schedule and on budget. Initial commissioning volumes are anticipated in late 2024, with full productive capacity expected in the first quarter of 2025.
As of February 2024, Phase I is approximately 50 per cent complete. Drilling and completions activities have commenced, construction of the Phase I facility and related infrastructure is approximately 30 per cent complete, and installation of the gathering pipelines is approximately 40 per cent complete.
As of Q4 2023, construction of our Attachie Phase I facilities and related infrastructure is approximately 30 per cent complete.
Drilling and completions have commenced with two drilling rigs active in February.
Installation of the gathering pipelines is 40 per cent complete.
As of Q3 2023, construction of our Attachie Phase 1 facility is approximately 20 per cent complete. Key milestones achieved include: the natural gas sales line is installed, 75 per cent of facility pilings installed, water recycling ponds installed and compressor buildings installed.
Pilings at the plant site are 75% complete and the facility’s water recycling ponds have been installed.
The natural gas sale line is installed.
The tank farm for secondary containment is installed.
Installation of the facility’s compressor buildings is complete.
ARC Resources Ltd.
1200, 308 4 Ave SW
Calgary, Alberta T2P 0H7
Local
Toll-free
Fax
403-503-8600
1-888-272-4900
403-509-6427
24-Hour Emergency Line
403-292-0434
ARC Resources Ltd.
1200, 308 4 Ave SW
Calgary, Alberta T2P 0H7
Local
Toll-free
Fax
24-Hour Emergency Line
403 503 8600
888 272 4900
403 509 6427
403 292 0434
We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic. By clicking “Accept & Close”, you consent to our use of cookies policy